Maritime Analytica

Maritime Analytica

Maritime News

Why Is HMM Adding More Ships—but Cutting Its Capacity Target?

More vessels. Smaller ships. A wider network may be the real strategy.

Maritime Analytica's avatar
Maritime Analytica
Jul 31, 2026
∙ Paid
Why Is HMM Buying Oil Tankers?

Why Is HMM Buying Oil Tankers?

Maritime Analytica
·
Jun 4
Read full story

HMM has changed its 2030 fleet plan.

The previous target was 130 container ships and 1.55m TEU.

The new target is 166 ships—but 1.47m TEU.

That means 36 more vessels, while planned capacity falls by 80,000 TEU.

It looks like a contradiction.

It may actually reveal a major change in strategy.

HMM is still growing.

But it appears to be moving from a fleet built mainly around ship size to a network built around reach.

Here are the 4️⃣ signals that matter. 👇


1️⃣ The average ship is getting smaller

Under the previous target, the simple average was around 11,900 TEU/ship.

Under the revised plan, it falls to around 8,900 TEU.

That is a reduction of roughly 26%.

This post is for paid subscribers

Already a paid subscriber? Sign in
© 2026 Maritime Analytica · Privacy ∙ Terms ∙ Collection notice
Start your SubstackGet the app
Substack is the home for great culture